Skip to main content
Municipal Free Pro Features Available

Sludge Production & Disposal Cost Calculator - Volume, Dewatering & Annual Budget

Estimate sludge production, dewatered volume & compare disposal methods

Estimate daily sludge production, volume after dewatering, and annual disposal cost for any wastewater treatment plant. Enter flow rate, influent quality, and dewatering method to get dry tons per year, wet volume after processing, and disposal cost comparison across land application, landfill, and contract hauling.

Pro Tip: Sludge disposal is the fastest-growing line item in most municipal wastewater budgets. Land application is typically the cheapest option at $30-60/wet ton, but landfill disposal can exceed $100/wet ton including hauling. Every 1% improvement in cake solids from dewatering reduces hauling volume by 3-5%, which directly reduces disposal cost.

PREVIEW All Pro features are currently free for a limited time. No license key required.

Sludge Production & Disposal Cost Calculator

How It Works

  1. Enter Plant Loading

    Input flow rate (MGD), influent and effluent TSS, influent and effluent BOD, and select your treatment type. The calculator estimates primary and biological sludge production separately.

  2. Select Dewatering Method

    Choose from belt filter press, centrifuge, screw press, drying beds, or no dewatering (liquid disposal). Expected cake solids auto-fill but can be adjusted.

  3. Enter Disposal Costs

    Input your disposal cost per wet ton or per cubic yard and optional hauling cost per mile. Select disposal method for comparison calculations.

  4. Review Production and Cost

    See daily sludge production in lbs/day, annual dry tons, dewatered volume, and total annual disposal cost with per-MG and per-dry-ton breakdowns.

Built For

  • Plant managers building annual sludge disposal budgets
  • Engineers evaluating dewatering equipment upgrades
  • Operators comparing disposal method costs
  • Finance staff projecting wastewater operating expenses
  • Consultants evaluating biosolids management alternatives

Frequently Asked Questions

Primary sludge production ≈ Flow (MGD) × TSS removed (mg/L) × 8.34 lbs/day. Primary removal is typically 55-65% of influent TSS. Biological (WAS) sludge ≈ 0.5-0.7 lbs per lb BOD removed for conventional activated sludge. Total dry sludge = primary + WAS. A typical 1 MGD plant produces 800-1500 lbs/day of dry solids.
Belt filter presses typically produce 18-22% cake solids. Centrifuges achieve 20-28%. Screw presses produce 16-22%. Drying beds can reach 25-40% depending on climate and drying time. Higher cake solids mean less volume to haul and lower disposal costs, but come with higher polymer consumption and energy use.
A 1 MGD plant producing 1,000 lbs/day of dry solids, dewatered to 20% cake (5,000 lbs/day wet = 2.5 wet tons/day), at $50/wet ton disposal including hauling, spends roughly $45,000/year on sludge management. Actual costs vary widely by region, hauling distance, and disposal method.
Disclaimer: This calculator provides planning-level estimates. Actual sludge production depends on wastewater characteristics, treatment process operation, and seasonal variation. Disposal costs vary by region, hauling distance, regulatory requirements, and market conditions. Always base budgets on actual historical production data when available.

Learn More

Municipal

What Your Sludge Actually Costs

How to estimate sludge production from plant loading, the real differences between dewatering methods, and why disposal costs only go up.

Municipal

Why Small Towns Still Use Lagoons

Capital cost vs mechanical plants, loading rate myths, winter performance reality, and how to size a lagoon that actually works in your climate.

Related Tools

Municipal Live

Chemical Dosing Calculator

Calculate gallons per day or pounds per day of chemical feed for any water or wastewater treatment process. Supports chlorine, alum, ferric chloride, polymer, lime, caustic, permanganate, and fluoride with automatic unit conversions and metering pump settings.

Municipal Live

Detention Time Calculator

Calculate hydraulic detention time for any basin, tank, or lagoon and check against regulatory minimums. Supports rectangular and circular tanks with dead zone correction for actual vs theoretical retention time.

Municipal Live

Disinfection CT Value Calculator

Calculate CT values for chlorine disinfection and verify EPA Surface Water Treatment Rule compliance. Check Giardia and virus log inactivation credits based on residual, contact time, temperature, and pH.